DevB Mandate AI Adoption Required from 1 June 2026 — see how Pyramid prepares your team
What's new

Changelog

New features, improvements, and fixes shipped by the Pyramid AI team.

Oct 14, 2026 Latest

Tender Price Comparison — every tenderer's prices side by side

Pyramid's Tender Price Comparison workbook: every tenderer's priced Bill of Quantities items laid out side by side in one Comparison sheet, with Lowest, Highest, Spread and Spread % worked out per item and the biggest deltas highlighted — alongside the Review prices panel showing a single uncertain handwritten price next to its source scan for one-at-a-time verification

Tender Price Comparison spots the lowest and highest price on every item for you. Line up different contractors' and vendors' BQ submissions side by side, see the price gap on each item flagged — and walk into negotiations knowing exactly where they diverge, so you can push on price and choose the right contractor to take forward.

Prices it can't read with confidence, like handwriting, are flagged for a quick check against the scan — so the figures you're comparing are ones you can stand behind.

  • Check — Tender Price Comparison: side-by-side pricing across tenderers from one combined PDF or up to eight separate ones, with the spread worked out per item and the biggest deltas highlighted
  • Check — Review prices: verify any uncertain price one at a time against the source scan — uncertain prices are kept out of the lowest / highest comparison until you confirm them
  • Check — Versioned workbooks: each round of corrections produces a new version, all listed and downloadable in Reports
Oct 9, 2026

The 2026 Policy Address is now in Open Library

Pyramid Next Gen chat answering what the 2026 Policy Address says about land supply in the Northern Metropolis, with a cited answer and a Sources card — the selected source opens a side panel showing the Chief Executive's 2026 Policy Address itself, Chapter V, with the cited paragraph highlighted on the page and a download button

Ask Pyramid what the Chief Executive's 2026 Policy Address or the new First Five-Year Plan says — on housing, land supply or infrastructure — and get a grounded answer with the exact passage cited, in English or Chinese.

Both are now in Open Library, so the latest government direction is one question away instead of buried in hundreds of pages.

  • Codes — The 2026 Policy Address and its supplement, and the First Five-Year Plan (2026–2030), are in Open Library in English and Chinese — answerable in chat with the source cited
  • Codes — Open Library keeps up with the latest Buildings Department codes
  • Codes — Open Library answers from the current version of a document
  • Codes — HK Government Directory questions about DSD now return the right officer
Oct 6, 2026

Keep watch on planning applications — in chat

Pyramid Next Gen chat answering a question about Town Planning Board applications open for public comment near Kwun Tong: a card listing the cases ordered by objection deadline, the one closing today flagged in red with a left border, the others showing amber days-left badges and deadline dates — alongside a district-disambiguation card asking which scheme is meant, with Central District (H4) and Central District (Extension) (H24) offered as chips to pick from

When someone applies to develop or change the use of a site, the Town Planning Board publishes it — and there's only a short window to have your say before it's decided. Instead of watching the government portal yourself, just ask Pyramid what's been filed near you, and it brings the live applications into chat, sorted by deadline, with anything closing today flagged first so nothing slips past.

Open any application to read its documents without leaving the chat, and set a Scheduled Task so Pyramid keeps watch and tells you when something new comes up.

  • Agents — Planning Watch in chat: Town Planning Board applications open for comment, ordered by objection deadline with the ones closing today flagged; case search with type badges (s.16 / s.12A) and a warning when the portal caps results; district disambiguation; case detail with documents you can open
  • Check — Extraction review: low-confidence values from scanned or handwritten Bills of Quantities pause for a quick keep-or-correct pass, each with its reason, a confidence badge and the source crop; corrections flow through to the extract and the downloaded Excel
  • Check — The extract is colour-coded by confidence, with corrected cells in blue and a full-screen side-by-side source page
  • Codes — A maintenance term contract's Standard Method of Measurement, General Preamble and Schedule of Rates can now be loaded as structured rulebooks and searched clause by clause in chat
  • Codes — New rulebook admin: see every Standard Method of Measurement in one place with its clause count, switch it on per organisation, and read the stored clauses before handing it to a customer
  • Agents — WhatsApp photo analysis now lets you choose which organisation, project or shared knowledge base a site photo is checked against
  • Check — Bills of Quantities that previously got stuck on “Reading document structure” or “Generating report” on certain files now run through to the end
  • Check — BoQ processing holds up under heavy load instead of running out of memory, and no longer hangs silently when a run times out
  • Check — Design Compliance: drawing PDFs that failed to load now open
Sep 28, 2026

Scheduled Task

The Pyramid platform's Scheduled Tasks screen, reached from the sidebar: a table of saved prompts, each with its organisation, cadence (daily or weekly at a set time and time zone), next fire time, last-run status and an enable toggle, and a New scheduled task button — alongside an email notification confirming a scheduled task has completed, with a link to open the result in chat

A regulatory watch is the kind of job that slips in a busy week: every Monday, going through the Town Planning Board's planning portal and the Government Gazette for new or updated applications, permissions and notices near the sites you look after. Write that question once, set how often it runs and in which time zone, and Pyramid runs it on its own and emails you when the answer is ready, with a link into the chat. Every run is kept, so you can see when it last fired and what it found — and pause or change it whenever you like.

  • Ask — Bring a draft Task Order to chat and have its Schedule of Rates items checked: whether each item suits the maintenance work described, whether anything is missing against similar Task Orders you have run before, and whether every item exists and applies under the current contract's general particulars, preambles, method of measurement and Schedule of Rates
  • Ask — Ask what a method of measurement says about something and get the governing clause back word for word, with the page it came from and the items it applies to
  • Check — Send your bill and your preamble as two separate files. Leave the preamble out and Pyramid still reads it from the bill, as before
  • Check — Every project is checked against its own preamble, so five contracts sharing one method of measurement no longer share one preamble
  • Codes — A Schedule of Rates and its method of measurement can now be loaded as one rulebook, with every clause checked against the printed document before it goes live
  • Ask — Copy a question you have already asked in one click, and put it again to another organisation or a different knowledge base
  • Platform — Invitation emails are short and to the point
  • Agents — New chat opens straight away from an open Next Gen conversation, instead of needing a page refresh
Sep 19, 2026

The BoQ Checker now supports your own Standard Method of Measurement

Working to your own Standard Method of Measurement? We will set it up for you, and your bills are checked against it like any other — with the rules applied and the preamble references set out behind every finding.

  • Check — Upload a Bill of Quantities as an Excel file, not just a PDF, and the totals Pyramid works out are shown as currency
  • Codes — Richer Open Library coverage: 1,400+ EMSD documents, 550+ FSD circulars and 230+ from DSD now answer from their full content
  • Ask — Download the original file from the sources panel under its own filename, so the document you cited goes into the submission with you
  • Ask — In a long answer the message box stays at the bottom instead of being pushed off screen, with an arrow to jump back to the newest reply — in both classic and Next Gen chat
  • Agents — Drag and drop a file straight into Next Gen chat
  • Platform — Give your organisation an assistant profile, so answers come back in your sector's terms and the way your team works
  • Connect — Developer guides now cover Open Library and the Safety Assistant, including how to reach either one from the chat endpoint
  • Agents — With no project selected, Next Gen chat now searches every project you own or belong to, instead of finding nothing
  • Ask — Sources are labelled by where they actually came from: files you uploaded to a project no longer show up as organisation sources
  • Ask — The sources card waits until the answer has finished, rather than appearing and being clickable halfway through
  • Ask — Source viewer: a PDF now stays where you leave it instead of drifting down the page, and documents that would not open now load
  • Platform — You can create a new project again, the mobile app login works, and chat titles in the sidebar are in the right language
Aug 31, 2026

Open Library now covers Singapore

The Singapore Open Library browser with the source filter open, listing every government body in the collection and how many documents each contributes — Building and Construction Authority, Urban Redevelopment Authority, Singapore Civil Defence Force, Workplace Safety and Health Council, Ministry of Manpower, PUB, LTA, NEA and more — across 11,320 records

Ask about Singapore rules the way you already do for Hong Kong, and Open Library answers from the official source. It now holds over 10,000 documents from 17 Singapore government bodies — SCDF's Fire Code, BCA circulars and standards, URA's Master Plan, CORENET X's Code of Practice, PUB, LTA, NEA, MOM and the WSH Council, and parliament records going back to 1955. Every answer shows the document it came from, and Hong Kong and Singapore stay separate, so your team only sees the country it works in.

  • Platform — Share a project with everyone in your organisation, or by a link. Both are view-only, and you can switch either off whenever you like
  • Platform — Add a group of colleagues to a project in one go, rather than one person at a time
  • Check — A Bill of Quantities turned into Excel now matches the original: same item numbers, same order, full descriptions and quantities
  • Agents — Photos and PDFs you attach in Next Gen chat now work for every kind of question, not just drawing comparisons and site safety photos
  • Agents — Chat no longer tells you it can't see your image after you have uploaded one
  • Platform — Questions no longer fail with an error message instead of an answer
  • Platform — Excel and PDF files that used to fail when you added them now go through
  • Check — A Bill of Quantities no longer gets stuck on “Reading document structure”, so there is no need to refresh the page
Aug 24, 2026

BoQ Checker — check subcontractor pricing automatically

A scanned Bill of Quantities on the left and Pyramid's extracted, checked Excel on the right: Pyramid reads the printed quantity and rate on each line and verifies the amount equals rate × quantity — most lines pass, and one is flagged where 640 m × 950 doesn't match the stated amount

When priced Bills of Quantities come back from subcontractors and you consolidate the numbers, the BoQ Checker now does the arithmetic check for you. It reads the printed rate and quantity on every line and confirms each total equals rate × quantity — flagging the lines that don't add up, so a QS no longer has to re-check thousands of rows by hand.

It works straight from the scanned PDF submissions: Pyramid extracts each bill into a clean Excel that mirrors the source — item numbers, row order, quantities, units and full descriptions, with section headings kept separate — so the figures it checks line up with the document exactly.

  • Check — New line-total check: reads the printed rate and quantity and verifies total = rate × quantity on every item, flagging any mismatch
  • Check — Faithful PDF-to-Excel extraction: correct item numbering and source row order, accurate quantities and units, complete descriptions, and section headings kept out of item text
  • Check — Bills that previously failed to extract now process successfully
  • Check — Items are no longer dropped from the extracted table
Aug 20, 2026

Next Gen chat — an agentic assistant with 40+ construction skills

Pyramid Next Gen agentic chat comparing two versions of a construction drawing: a completed five-step task list, a downloadable difference report and change register, and a marked-up overview highlighting the changed regions, alongside a side-by-side Version 1, Version 2 and exact-delta comparison of the seating-bowl plan

Chat is now agentic. Ask Pyramid to do the work and it plans the task, shows its thinking as it goes, and calls on 40+ skills purpose-built for construction — from measurement and compliance to drawings and safety. Attach PDFs and images straight into the conversation, watch each step complete in a live task list, and get real deliverables back: downloadable reports, registers and marked-up files, rendered right in the chat. Next Gen chat is rolling out per organisation — ask us to switch it on for your team.

The headline new skill is drawing comparison. Upload two versions of a drawing and Pyramid renders both at matched resolution, computes the exact change, and marks up every region that moved — then hands back a difference report, a zoomed change register, and an annotated overview. Each change is listed and explained in plain language ("substantial revision to seating, radial access and perimeter geometry"), so a reviewer sees what changed between revisions in seconds instead of overlaying prints by eye.

  • Platform — New Agents and Skills management in System Settings: admins can browse and configure the agents and skills available to Next Gen chat, backed by the shared Pyramid registry
  • Codes — Open Library retrieval is sharper for document-code lookups and Chinese-language (CJK) queries, with answers grounded more tightly in the cited source
  • Platform — Attachments now upload directly to secure storage, so large PDFs send reliably and a message can't go out before its files finish uploading
  • Agents — Generated artifacts such as marked-up drawings keep working after a reload instead of expiring or triggering a browser security warning
Aug 7, 2026

Schedule Intelligence for Primavera P6 (Pilot)

Pyramid Schedule Intelligence for Primavera P6: a three-step setup to upload a P6 .XER export and choose how activities are grouped into phases, alongside a sidebar of analyses including DCMA quality, risk register, S-curves, resource histograms, look-ahead, phase and discipline analysis, EVMS, and float and critical path

Drag in a Primavera P6 .XER export and Schedule Intelligence reads the whole programme, then interrogates it the way a planning engineer would — DCMA quality checks, earned value (EVMS), S-curves, resource histograms, look-ahead, float and critical path, and phase and discipline breakdowns. It also builds a risk register from what it finds and drafts a response letter you can work from.

Activities are grouped into phases either from a WBS mapping you upload or inferred automatically from your WBS structure and activity names, so you get a phase view even when the programme wasn't built with one. The analysis runs entirely in your browser, supports P6 XER v6.0 – v23.x, and a demo programme is one click away if you'd like to see the full output before uploading your own. Rolling out as a Pilot — ask us to switch it on for your organisation.

  • Codes — Added the EMSD codes of practice and technical guidelines, including the Building Energy Efficiency Ordinance material, after a customer flagged the gap
  • Connect — Questions about the latest circulars over MCP now read newest-first, so asking for "the latest technical circulars from DevB" returns current ones rather than answering from older material
  • Platform — Invitation emails now consistently use the organisation name your admin configured
  • Ask — Asking for a summary of every chapter in a long document now returns an answer instead of retrieving the sources and stopping
  • Codes — Contacts in the HK Government Directory now link to the officer you asked about instead of another similarly listed name
  • Check — "Continue with check" on a Bill of Quantities no longer stops with an error partway through
  • Platform — Scanned documents now have their text extracted without being marked for OCR by hand, so content that appeared to import but couldn't be found in chat is retrievable
  • Platform — Documents that previously failed during processing, including several large guideline manuals, now import successfully
  • Platform — Organisation owners and system admins can upload, process and sync organisation documents again
  • Platform — Custom roles such as Org Admin and Project Admin now carry the permissions they are granted, so admins holding them can invite members again
  • Platform — Members without admin rights can no longer open Settings pages other than their own Profile
Jul 24, 2026

BoQ Checker — sharper on accuracy, ~90%

Pyramid BoQ Checker workflow: a 1,284-item Bill of Quantities PDF is checked against SMM rules, preamble amendments, and engineering judgment, producing categorised findings — 12 missing items, 7 wrong units, 4 extra items, 23 to review — at 90%+ accuracy

Upload a Bill of Quantities and the Checker matches every priced line item to the right Standard Method of Measurement (SMM) rules, surfacing what's missing, mis-measured, or extra. Your QS team reviews a short list of real issues instead of combing through thousands of lines by hand.

Benchmarked against 400+ real BoQ items reviewed by domain experts, the Checker now reaches ~90% accuracy — ready to run on live projects.

  • Check — More accurate SMM section routing: pipework is no longer mistaken for drainage, and watermains and rising mains are now recognised, so valid items are no longer swept into "remove"
  • Check — Uploading a document to run a compliance check without typing a message no longer shows an error; file-only checks now process normally
Jul 17, 2026

More accurate answers from Open Library

Pyramid Open Library showing its collection of crawled Hong Kong government publications, kept up to date across departments

Open Library now understands which government department you're asking about and keeps its collection of circulars, standards and publications current as they are updated. The result is more accurate, better-sourced answers, with the most relevant and up-to-date guidance surfaced first.

  • Codes — Added more DSD and WSD material, and department-specific searches now return the right department's documents for HyD, CEDD, DSD and WSD
  • Codes — Answers now separate current requirements from proposed changes, drawing on the latest circulars, consultations and press releases
  • Codes — Recognises industry shorthand such as "4S" (Smart Site Safety System) and cites the official source
  • Ask — Open Library is always reachable in chat now, with earlier hangs and occasional errors resolved
  • Ask — Global chat no longer answers from a single project by mistake; it searches only what you've selected
  • Codes — Source detail panel now loads for image-only document segments instead of erroring
Jul 10, 2026

Draft and review method statements with AI (Pilot)

Pyramid Method Statement Writer showing a generated RAMS document for external scaffolding works, with a 5×5 risk assessment matrix colour-coded from low to extreme risk

Two new AI tools bring method statements into Pyramid. The Method Statement Writer turns a short task description into a complete RAMS document referenced to Hong Kong regulations, including a 5×5 risk matrix, step-by-step work procedure, PPE schedule, ITP hold points and an illustrated safety guide, all in about a minute. The Method Statement Checker reviews a contractor's submission the way a senior Resident Engineer would, testing 12 technical areas and 14 safety aspects and returning a severity-tiered, code-referenced mark-up with paste-ready proposed revisions. Both are rolling out as a Pilot.

  • Check — Two new check types, Design Compliance and Drawing Difference, added to the check selector (Pilot)
  • Check — BoQ findings are now grouped by Bill, Section and Category, with a bill filter and full detail on each finding
  • Check — Uploads that aren't a valid Bill of Quantities are now clearly rejected instead of failing mid-run
  • Platform — GPT-5.4 is now the default model across chat, checks and summaries
  • Check — A compliance run's progress and results now update on their own, so you no longer have to refresh the browser to see a run finish
Jul 3, 2026

Convert a Bill of Quantities PDF into a structured Excel workbook

Pyramid Extract view showing a Bill of Quantities converted to a formatted Excel sheet — BILL 9 Pre-bored H-piles with itemised rows (9.40–9.45), descriptions, quantities and units — with Download and Full screen controls and per-bill tabs

Upload a Bill of Quantities PDF and Pyramid rebuilds it as a proper Excel workbook: because it understands the BoQ format, it splits the document into separate bills across tabs and lays every item out in the right columns for item, description, quantity, unit and rate. You no longer need to run a full compliance check just to get the data out, and the new extract-only mode returns the workbook on its own, ready to download or open full screen.

  • Codes — Open Library is now its own knowledge source for government circulars, practice notes and DEVB/CEDD press releases, with a department filter that surfaces press releases that were previously buried
  • Ask — Chat no longer dead-ends. If one assistant finds nothing, Pyramid now checks your other assistants before saying it can't answer
  • Connect — New API keys are automatically scoped to the environment you're in, so a key can't be created for the wrong one
  • Check — BoQ checks now handle multi-column (matrix) rate items and deemed-included coverage more accurately, and flag out-of-section items
  • Platform — Switching or creating an organisation refreshes cleanly, and new organisations have Projects on by default
  • Ask — Source counts now match the library that actually returned the documents
  • Ask — Answers are kept if your connection drops, and reloading no longer shows a "request couldn't be processed" banner
  • Ask — Fixed a chat crash during streaming when listing library documents or generating a chart
Jun 26, 2026

BoQ Checker — automatic Bill of Quantities compliance checks

Pyramid BoQ Checker showing a completed Bill of Quantities compliance run — 35 rows checked, 28 pass, 7 issues — with per-item findings, AI explanations, and applied SMM rules and preamble amendments

Upload a Bill of Quantities and Pyramid checks it for you — end to end. It reads the document structure, extracts every priced line item, applies the contract's preamble amendments, then matches each item against the Standard Method of Measurement (SMM). You get a clear pass/fail breakdown with each issue flagged as a missing item, wrong unit, or extra item.

Every finding comes with an AI explanation: what was expected versus what was found, the suggested correction, and the exact SMM rule or preamble amendment it was measured against — so a QS can verify the call in seconds instead of cross-referencing by hand. When the run finishes, Pyramid generates a downloadable report. What used to take days of manual checking now runs in minutes.

  • Check — Compliance runs now show elapsed time, and stuck runs can be cancelled from the panel
  • Check — A clearer empty state appears when every analysis type is switched off, and the action to start a check is now plainly labelled
  • Platform — Panel dividers are now draggable, so you can resize the workspace to suit a wide findings list or a wider chat
  • Ask — For time-sensitive questions, the assistant now searches the web before falling back to your documents
  • Platform — "Process Documents" reliably triggers ingestion again at both organisation and project level
  • Platform — Branding controls are consolidated into a single settings location instead of appearing in two places
Jun 16, 2026

MCP Server — query your documents from any AI client

Your tools can now query Pyramid's document corpus directly using the Model Context Protocol. Any MCP-compatible client — Claude, Cursor, or your own agents — can search your documents and receive cited source links, without manual export or switching between systems.

Read the documentation ↗

  • Check — Tender Check analysis runs end-to-end against the full check engine
  • Connect — API clients can request a time-limited download link for any source document
  • Agents — GPT-5.4 routing is restored across assistant and document query flows
  • Platform — Switch Organisation returns to the account menu for multi-organisation users
  • Codes — Open library search returns publications in the correct order, and document summarisation with section highlighting is restored
  • Platform — The file filter in organisation settings responds correctly to typing
  • Platform — The duplicate Organisation tab is removed from settings navigation
  • Ask — Refreshing after a completed query no longer triggers a processing error
Jun 9, 2026

Connect Pyramid to your own systems via API

The Pyramid API is here. Partners and DWSS providers can now connect their own systems to Pyramid in just a few minutes — then ask questions directly against their document database and get cited answers back, with no manual uploads in between.

Query your knowledge base with single questions, multi-turn chat with live streaming, or up to 500 questions at once with CSV export. Run compliance checks programmatically — ask "based on criteria X, Y and Z, is this compliant?" across a whole batch of documents and get structured results. Manage projects and upload, process, and download documents straight from your own systems — all secure by default with API key authentication and hardened request validation.

It's also a fast path to the Development Bureau (DevB) AI Technical Circular (Works) No. 3/2026, which sets new expectations for how consultants and contractors manage and adopt AI. Teams can stand up their own AI assistants in minutes and wire them directly into their DWSS — embedding compliant, cited AI into the systems they already use, rather than bolting on a separate tool.

Read the API documentation ↗

Jun 2, 2026

Procore Connector — 5 integrations now live

Procore connector setup screen in Pyramid AI

Connect your Procore projects directly to Pyramid. Files sync automatically from your Procore folders into the knowledge base — no manual uploads needed. Pyramid now supports 5 connectors: Google Drive · SharePoint · OneDrive · Autodesk Construction Cloud · Procore.

  • Platform — Knowledge dashboard can now be filtered by email domain wildcard — admins can pre-populate a department domain to scope rankings and member views
  • Platform — Branding controls now include a custom chatbot icon — upload, auto-crop, and rendered as a circle alongside your company logo
  • Platform — Navigation updated: History moves into Settings, Organisation settings shift to the Profile dropdown, Project invitations appear as a banner inside Projects
  • Platform — Team members can create new organisations again — button was accidentally removed in a prior UI update
  • Platform — Admin invite flow restored — add by email and send invite link is fully functional
  • Platform — "Process Documents" on project and org pages now correctly triggers document ingestion
  • Platform — Duplicate chat history entries no longer appear in the sidebar
May 27, 2026

GPT-5.4 available, plus smarter document prioritisation

Model selector showing GPT-5.4 alongside other available models

GPT-5.4 — OpenAI's most advanced model with an extended context window — joins the model selector. Pyramid also now ranks answers by the effective date of the content itself, not just the publication date, so you always get the most current answer even when older documents cite newer standards.

  • Platform — GPT-5.4 now available in the model selector alongside GPT-4.1, DeepSeek 3.2, and Qwen 3.5 (122B); older Qwen models removed to keep the list focused
  • Ask — When two documents cover the same topic, Pyramid now prioritises the one with the most up-to-date content — ranked by effective date, not publication date
  • Codes — Regulatory codes updated incrementally, or cited across different government department versions, now surface the most current answer correctly
May 26, 2026

Reorganised navigation and new admin controls

Updated sidebar navigation showing reorganised sections

The sidebar is reorganised so every section lives where you'd expect it. Admins gain new controls for onboarding flows and module-level access — so new members are guided into the right workflows from day one.

  • Platform — History moves into Settings; Organisation settings shift to the Profile dropdown (admins only); Project invitations appear as a banner inside the Projects page
  • Platform — Admins can configure onboarding questions and prompts so new members are guided into the right workflows from day one
  • Platform — Feature flags let admins control which modules members can access — Projects and Check can be toggled per organisation
May 2026

Google Drive, SharePoint, OneDrive & Autodesk now live

Connector selection screen showing Google Drive, SharePoint, OneDrive, and Autodesk Construction Cloud

Connect your project folders directly to Pyramid. Files sync automatically into the knowledge base — no manual uploads needed. Granular folder-level permissions mean users grant access only to the folders they select, not the entire account.

  • Platform — Google Drive, SharePoint, OneDrive, and Autodesk Construction Cloud connectors now live for all users
  • Platform — Granular folder-level permission scoping across Google Drive, OneDrive, and SharePoint — users grant access only to selected folders